Liaisoning Architect for Building Permission in Pune
Get Liaisoning Architect for your building permission in Pune. get free quotation for your project
Contact Us
Services related Liaisoning Architect
Building Permission
Get Building Permission from Local Planning authorities
Plinth Checking
Get Plinth Checking done of building in Pune
Commencement certificate
Get Commencement Certificate from local planning authorities in Pune
Customer Review
Looking For Liaisoning Architect Services at Best Price?
Choose ease and professional compliance, choose Easton Associates..
- Get your free consultation today!
Â
Know more about Liaisoning Architect for Building Permission in Pune
Blue prints drawings with authority sign and stamp are final drawing prepares by the Liaisoning architect for building permission. For instance, Advantage to appoint architect for liaisoning services is they have their own checklist for blueprint. Once approval is granted for Blue prints, it is very difficult to change. A liaisoning architect plays an important roles to get document clearance for building permission, maximum extraction of built up area, procures all Noc’s and gives an legal opinion for building rules to get maximum benefits. In addition, liaisoning architect can make mistake free submission drawing  as well as does design working drawing, which saves huge time in approval process.
When building permission is required
Municipal permission for any construction is required if you are
- Building a house or bungalow
- Planning New building like residential, commercial, hospital, clinic or hotel
- Demolish & Rebuild home
- Change of building use like, residential, commercial, hospital, clinic or hotel
- Changing building plans after approval
- Renovation of property
- Major internal changes in your dwelling
- Change in basement, parking, Out house, Shed etc. . .
- Regularization of unapproved building
List of documents for building plan approval
There are many documents required for construction approval. Following are the given list required to get the building permission
Government Land demarcation (latest by 4 years)
7/12 Extract (saat bara utara)
Property card to prove ownership on land.
Property Tax NOC
Layout Plan (if Available)
Pre DCR-Drawing and Report
Site Photos
Building drawing as per UDCPR Rule 2020
Garden NOC
Fire NOC
Aviation NOC
Society allotment letter
Structural consultant letter
Owner’s registration
Shapath patra, Bandh patra (bond papers) are to be given by owner.
Zoning certificate
Land acquisition (LAQ)
NA Order
Title Search Report
Process involved to get the building permission
Getting done the job of building permission from local planning authority is quiet hectic job. Easton’s team get it done in hustle free way. The process involves as follows,
- Zoning Permission
- building plan approval Application
- Procuring all required NOC’s
- Payment of scrutiny Fee
- submitting building plans for approval (Offline drawing submission)
- Site visit by concerned officer
- Order for approval & development charges
- Payment of development challan by owner
- Submission & approval stamps on final blue prints
- Submission of scan copy of approved drawings.
Cost factor involved to get the building permission
Well, building approval cost differs from location to location, as it is calculated on land rate or ready recknor rate of any area. For instance, Development charges include Construction development charges ( 4% land ready reckoner rates), Land development charges, lift, basement charges, Labour cess, waterline development charges, excavation charges etc.
What Are the Building rules in PCMC?
Get Unified Development Control and Promotion Regulations (UDCPR Building Rules)
Duties and Responsibilities of the Liasioning Architect
Followings are the duties and responsibilities of the liaisoning architect for building permission
- Design as per Client’s requirements and site conditions with the help of rules set by local municipal corporations
- Prepare and submit plans as per the Regulations and shall be responsible for correctness of the calculations and dimensions mentioned on the plan and shall be liable for consequences arising thereof.
- Represent before the Authority for scrutiny of drawings.
- Prepare and issue working drawings details in conformity with approved plans.
- Advice client to appoint Site Engineer/ Supervisor, in case he himself is not undertaking the supervision work.
- Inform Authority about Commencement of work on site.
- To verify the work at obligatory stages of plinth completion, completion of RCC structure and superstructure completion to ensure work progress in conformity of approved drawings and dimensions.
- Inform Authority about reaching relevant stage of work where stage-wise approval from the authority is required.
- Issue completion / part completion certificate for submission to the authority.
- Inform in writing to the Authority in case of violation by Client during the period of appointment
- To assist and co-operate with the Authority and other officers in carrying out and enforcing the provisions of Maharashtra Regional and Town Planning Act, 1966 and of any regulations for the time being in force under the same.
FAQ Related Building Permission in Pune
1.     How do we know that particular building has commencement certificate / completion certificate?
Well, this information is available on following website of PMC – https://pmc.gov.in/en
After clicking on the same link – go to Online Services – Building Sanction – registrations
Click here to know more Link –Â http://203.153.37.242/bpams/PMC/subscriberlogin.aspx), Where as other requisite information are also available at Zone Wise Building Permission Department, Kindly check below mentioned office as well-
Sr. No. | Zone No. | Office Address |
1 | 1,4,5,6 | Building Permission Department, Pune Municipal  Corporation  Main Building,Shivajinagar,Pune-411005 |
2 | 2,3 | Building Permission Department, Sawarkar Bhavan,Near Balgandharva theatre, Pune Municipal  Corporation ,Shivajinagar,Pune-411005 |
3 | 7 | Building Permission Department, Tilak Road Ward Office,Hirabaugh,Tilak Road,Pune Municipal  Corporation ,Pune |
2.     After submission of proposal within how many days proposal will get sanctioned?
After submitting all essential documents with building proposal, as per MRTP 1966 Act Clause 45 and development control rules, within days sanction plan or commencement certificate will be issued.
3.     Whether old limit of Pune Municipal Corporation area draft development control rules of PMC limit are submitted to government for approval?
If yes, from where its copy can be obtained?
Yes, Draft Development Control rules for old limit are submitted to state Government for approval. Copy  & details of Draft Development Control is available on Pune Municipal Corporation website-  https://pmc.gov.in/enÂ
4.     Is any facility available in Pune municipal corporation for immediate building sanction? If available, then what is a procedure of sanction
Well, Pune municipal issues sanctions through Fast track systems within 24 hours to those proposals which are submitted in prescribed format. The information of Fast Track Systems is available on following website.
Link – https://pmc.gov.in/en online service – Fast Track modalities
5.     Whether Building permission allowed on BDP reserved plots?
AS per Govt Gazette No. TPS/1814/697/ Sr.No.134/14/BDP/EP/ sanction /UD-13, Date:05/08/2015 specified used are allowed. No private construction is allowed. For details information connect Building Development Department, Pune Municipal Corporation, Main Building, first floor, Shivajinagar, Pune-411005
6.     To obtain plinth checking certificate which documents are essentials?
For Plinth certificate following documents are essential
- Application Form
- Architect Letter for completion of work up to plinth level
- Structural Design details drawing
- Structural Engineer’s Certificate
- Site Actual drawing
7.     What is minimum plot area required for building permission?
As per clause 13,14 of sanction development control rule minimum plot area required to obtain building permission is 20.00 Sq mt.
8.     Can building permission be obtained in green belt?
Sure. As per some clauses of sanctioned development control rule, maximum 4%construction is permissible in green belt for Golf club, Nursery, furniture godown, Electrical substation, Waste water, Water project and their staff quarters, sports and games, health club, tennis court, service restaurant, farm house etc.
9.     What is the maximum height permissible in Pune Municipal Corporation Limit?
In Pune Municipal corporation, maximum height up to 100 meter is permissible. Whereas, depending on plot area and road width details of height permissible is available in sanction development control rule government notification is applicable for building height between 36 to 100 meter.