Aviation NOC for Building Height Clearance in Pune
Get Aviation NOC certificate and consultation for building construction in Pune as early as with minimum cost. Quick process
Contact Us
Services Related to Aviation NOC
Aviation NOC
Aviation Noc For Residential , Commercial & all high rise building.
Elevation Certificate
Elevation Certificate For Residential , Commercial & all other building.
Ministry Of Defence NOC
Ministry of Defence NOC For Residential & Commercial Building
Customer Review
Looking For Aviation NOC Services at Best Price?
Choose ease and professional compliance, choose Easton Associates..
- Get your free consultation today!
Know more About Aviation NOC for building in Pune
As per the union governments decision, the Ministry of Defence (MOD) mandates the No Objection Certificate (NOC) for construction in restricted areas around the airports as the upgraded CCZM Maps. Whereas, Air force station at Lohegaon had submitted an upgraded colour coded zoning map of the air force station and the National Defence Academy (NDA) to apply for the Aviation NOC in Pune. In the same vein, As per the rule, aviation noc’s are mandatory for the construction of a building falls in red zone, funnel zone and building over 627 Meter high in the city.
Who Needs to apply for the MOD NOC / AAI NOC Required for construction near Indian Airforce Stations and Airport Authority of India (AAI) AirportsÂ
Applications for construction of building Falling within the 4KM from Airport is indicated as Red Zone in CCZM Map. Likewise, the same needs to be submit the application for Ministry of defence Noc in pune or MOD NOC. whereas, as given in APPENDIX C and other documents. In addition, Original and one copy to concerned command HQs (CATCO) and the other copy to nearest air force station. Whereas, construction proposals located between 4 Km to 20 Km from airport as indicated in pink and yellow zone upto the limit of highest elevation mentioned in CCZMs.Â
for instance, its mandatory to submit the application to Local Municipal Authorities. On the other hand, if the proposal applications with elevation height is higher than the mention height in CCZMs Map, but, falling within the Pink and yellow zone consequently, the same needs to submit the application to MOD or AAI Airport authority of india. similarly, it is also called as Building height clearance NocÂ
Procedure to get Aviation NOC / MOD NOC / Airforce Defence NOC in Pune
Well, the process to get the Aviation noc is sorted into 2 steps. Mainly, you need to know that in which colour code your plot falls as per the colour coded zoning map. secondly, check in respect with how remotely your plot is from airport. moreover, the CCZM map is calculated with respect to latitude and longitude. Now moving further you need the AMSL certificate or Elevation Certificate. Similarly, Elevation certificate is provided by the local planning authority. i.e.  PMC, PMRDA or PCMC. After that, with the List of all documents as per prescribed formats given at the appendices as per the Guidelines set by the Ministry of Defence (MOD). Subsequently, applicants are required to forward their proposals for Aviation Noc to Airport authority of india (AAI) or Ministry of defence. In conclusion, this complete process takes upto 3 to 4 months to receive the final Aviation Noc.
Easton Associates Team, serves Airport NOC from Airport Aothority of India (AAI NOC), for height clearance for sructures such as buildings, chimneys, Transmission Lines and Mastc etc
Documents required to get Aviation NOC / Defence NOC / AAI NOC
While submitting the application to the Ministry of defence Noc following documents needs to be submit along with the application
- Elevation Certification
Appendix C (application by registered Architect)
Undertaking by the applicant on stamp paper Appendix D1, Appendix D2, Appendix D3 (on stamp paper)
Appendix E
Appendix F
Drawing of Building section
Drawing of Building elevation
Topo sheet by survey of India
Time frame required to get the Aviation NOC
Well, IAF is is responsive to the needs of citizens to processing the Noc Cases. for instance it takes upto 30 to 60 Working days to get the aviation noc for building including solar modules on roof top.
Validity of the Aviation NOC
Considering inordinate delay involved in completion of the projects, the Aviation Noc for building is valid upto five years from the date of issue of Noc.
Colour Coded Zoning Map (CCZM MAP)
Colour coded zoning maps (CCZMs) have been formulated for all Indian Air Force aerodromes. Similarly, it has been handed over to the local municipal authorities. Likewise, upon the colour coding in the specific zone, a huge number of cases will be process by the local municipal authorities without any need to forward the application to Air Force Station. In shorty, It results in mitigating the procedures for approvals to all residential projects.
Documents required for Elevation Certificate
Well, for submit the application to local planning authority for elevation certificate, there are many documents in common for the elevation certificate and Aviation Noc. Whereas, easton associates makes easier to get elevation certificate in pune. Likewise, Followings are the list of documents required to apply for the Elevation Certificate from local planning authority
Appendix C (application by registered Architect)
Undertaking by the applicant on stamp paper Appendix D1, Appendix D2, Appendix D3 (on stamp paper)
Appendix E
Appendix F
Drawing of Building section
Drawing of Building elevation
Topo sheet by survey of india
Architect Application with Architect signature.
Pan Card Aadhar Card owner/developer.
7/12 extract.
DP plan mark with site location.
Authentication Co-ordinates, AMSL Height Aerial distance regarding. (Monarch surveyor or global surveyor)
Survey of India Topo-sheet with purchased receipt.
Location on CCZM Map ( with architects and authenticate surveyors sign )
Plan Cross Section of proposed building duly signs by architect &owner /developers showing co-ordinate & height on plan.
Google Co-Ordinates of plot.
Google Earth map indicating distance from proposed site to Pune ARP and NDA
Primove Map &  Sanction  Details.
Site Photograph.
Indemnity Bond (On Rupees 100/- Stamp Paper with Notary )
FAQ about Aviation NOC in Pune
What is funnel zone?
As per the colour coded zoning map (CCZM Map), six km stretch on the both sides of an airstrip, i.e. 18 Km is the funnel zone. In conclusion, aviation noc for building construction in the funnel zone is mandatory
Which types of building need aviation noc’s?
Any type of building construction which falls in either red zone, funnel zone or building is over 627 metre high needs to apply for the aviation noc. For instance types of building may includes, residential building, commercial complex, school, Gymnasium, recreation centre, sport complex, training centre of women, markets, cultural hall, fire stations, police stations, yoga centre and library,
I need modifications in MOD NOC, do I need to submit the application again?
Yes..! If you need modifications or alterations in existing structure or building, then the copy of the Earlier Noc issued by the MOD is to be enclosed along with complete fresh application for the same. Similarly, You can also check here the same https://indianairforce.nic.in/wp-content/uploads/2021/12/Guidelines-for-Issue-of-NOC-for-Constructions-around-IAF-aerodromes-1.pdf
What if I have not completed the construction within the 5 years, will my NOC be void?
If the proposal, for which noc has been issued, does not complete within the 5 years as applicable from the issue of noc, Therefore, the noc will be treated as cancelled and the applicant will be required to forward the new proposal for the issue of fresh noc.
Who issue the Mod Noc?
Mod Noc or Intimation of non-issuance of noc will be dispatched by the competent authority through register post.
How much time it takes to get the elevation certificate in pune?
normally, it takes upto 30 to 45 days to gets the elevation certificate. for instance, https://eastonassociate.com/helps you to get the elevation in less time with lowest charges